Related Articles
Forward article link
Share PDF with colleagues

LNG Project of the Year

Petronas Floating Liquefied Natural Gas 1 (PFLNG 1), Petronas

Petronas achieved a global first for the LNG sector in 2016 with the start-up of its cutting-edge floating LNG facility. The project marked a turning point in the goal to unlock small, stranded and often remote gas assets previously thought uneconomical. It also positioned the company as a leading figure in the move towards cleaner, more sustainably sourced fuels.

FLNG1 is an imposing feat of technical and innovative engineering. The facility manages to house an LNG processing train, normally 2.5km2 by area, on a floating vessel 360m long by 40m wide. Combined, the project has capacity to produce 1.2mn tonnes a year of LNG and a storage capacity of 170,000 m3. It also sets new standards for efficiency and safety. The facility is the first to offer side-by-side offloading of LNG in an offshore location, employing a marine loading arm transfer system and a dual row membrane type cargo containment system (CSS) to maintain balance. Numerous tests and studies were undertaken to ensure maximum performance regardless of operating conditions.

The project is an industry gamechanger and sets the stage for future FLNG projects. These vessels allow oil and gas companies the flexibility to develop, store and transport LNG close to offshore fields, and then redeploy the vessels to other fields when necessary. Previously these marginal fields would not have been developed due to the high cost of extracting the gas reserves and difficulty of connecting to pipeline infrastructure.

Petronas is now moving ahead with its next FLNG venture, PFLNG2, which will begin first production in 2020.

Also in this section
Pemex debt strategy at risk of unravelling
30 July 2020
The Mexican firm had made some progress arresting its hefty debt pile, but the economic downturn and government obsession with upstream targets has started to take its toll
US domestic M&A sent reeling
28 July 2020
Deal-making across the oil and gas patch has slowed to a crawl despite a swathe of potential devalued assets and strained companies eager to divest
Oil firms ready to pick up the infrastructure divestment pace
13 July 2020
Pipelines, storage facilities and processing plants could replace non-advantaged production as prime candidates